Start a new SiXiS project

PROJECT-ONBOARDING-V0-1 / PHASE 1 / PASTE-BASED FLOW

Draft 08659a31…

PROD ADMIN VIEW · READ-ONLY · WRITES STILL ON LOCAL
⊘ ABANDONED — do not resume
This draft was explicitly abandoned on 2026-05-11 03:41:53. Kept for audit. Do not /sixis-pickup this draft.
Brain dump (raw)
Original input from /new-project. Stored as raw evidence per FORCED_RULE_PO_02; never edited in place.
You saved the brain-dump for draft 08659a31-c056-4d41-ace4-c5ea0de70f9f: "stack-state retest 2"
Event timeline (4)
Every event tagged with this draft_id, in chronological order.
project_draft_started tommy · 2026-05-08 02:50:03+00:00
You started a new project draft via /new-project (draft_id=08659a31-c056-4d41-ace4-c5ea0de70f9f).
draft_saved tommy · 2026-05-08 02:50:03+00:00
You saved the brain-dump for draft 08659a31-c056-4d41-ace4-c5ea0de70f9f: "stack-state retest 2"
discovery_prompt_generated system · 2026-05-08 02:50:03+00:00
Generated the discovery drill prompt for draft 08659a31-c056-4d41-ace4-c5ea0de70f9f using prompt_templates.discovery_drill v3.
draft_abandoned tommy · 2026-05-11 03:41:53.685764+00:00
Draft 08659a31 abandoned: Smoke test: 'stack-state retest 2' (20 chars, 8 of 11). Bulk-abandon cleanup of smoke-test drafts per Tommy callout 2026-05-11.